This is Euan van Hest's Typepad Profile.
Join Typepad and start following Euan van Hest's activity
Join Now!
Already a member? Sign In
Euan van Hest
Recent Activity
Euan van Hest is now following Campbell
Sep 21, 2010
on receiving our plans we had 12 conditions of concent with them however, when the inspector turned up he had an electronic device similar to a laptop and when he searched up our concent conditions he had 25 that we were ment to meet leading us to fail our inspection... Continue reading
Posted Sep 21, 2010 at Euan van Hest's blog
Image
when the plans where designed the draftsman put on the plan the following detail for the timber piles: "125 x 125 H5 senton timber pile set 1.2m into a 450mm diameter x 3m deep hole" however, when the inspector turned up we also needed to get a geotec engineer in... Continue reading
Posted Sep 21, 2010 at Euan van Hest's blog
Euan van Hest is now following The Typepad Team
Sep 21, 2010