This is nitin's Typepad Profile.
Join Typepad and start following nitin's activity
nitin
Recent Activity
preliminary -preliminaries are the associated...
preliminary -preliminaries are the associated costs that contractors in the completion of a project, for example the cost of hoarding or a site office, or heating the site office, the costs that must be paid to establish and run a safe construction site. Preliminaries are a necessary cost on every... Continue reading
Posted Oct 18, 2010 at nitin's blog
Comment
0
building consent document= provideing all...
building consent document= provideing all information detailed in the correct application form. , the applicant shall supply the following contact information • Name of applicant company • Applicant point of contact (Project Officer) • Contact number • Facsimile number • Email address • Certificates required under applicable law (health, services,... Continue reading
Posted Oct 17, 2010 at nitin's blog
Comment
0
health and safety plans= A Safety Plan is a simple...
health and safety plans= A Safety Plan is a simple written document, which outlines how you intend to manage safety during a particular contract or on a particular worksite.. They must understand and comply with the requirements included in the plan. The plan should be compatible with your overall Occupational... Continue reading
Posted Oct 17, 2010 at nitin's blog
Comment
0
nitin is now following kat
Oct 17, 2010
PLANS SPECIFICATIONS= In order to be accepted by...
PLANS SPECIFICATIONS= In order to be accepted by the licensing authority, the plans of the proposed premises to which the application relates must include the following – (a) Floor plans and to a scale of 1:100 OR what the on the plan, each level of each building forming part of... Continue reading
Posted Oct 17, 2010 at nitin's blog
Comment
0
fixing for piles sentan. we were fixing bearer to...
fixing for piles sentan. we were fixing bearer to pile with galv nail and the pile were under 1m from the ground. as the t/a came and saw the galv nails and fixing plate on pile to bearer they told us that is not correct fixing it should be stainless.... Continue reading
Posted Sep 22, 2010 at nitin's blog
Comment
0
BUILD A RETAINING WALL we Dig a shallow trench...
BUILD A RETAINING WALL we Dig a shallow trench approximately 180mm deep and 350mm wide. Fill the trench with crushed rock and compact it 100mm deep leveling pad. we Spread and level approximately 25mm of course sand as a bedding layer. after that we Place the blocks side by side... Continue reading
Posted Sep 22, 2010 at nitin's blog
Comment
0
pile fixing for anchor piles we had to dig a hole...
pile fixing for anchor piles we had to dig a hole for anchor pile and brace it with braced pile. the pile must be at least 900mm into the ground. as we digged into the ground we found rock at 600mm into the ground so we stopped at that. why... Continue reading
Posted Sep 22, 2010 at nitin's blog
Comment
0
nitin is now following The Typepad Team
Sep 12, 2010
Subscribe to nitin’s Recent Activity