Construction Documentation and Communication 3...
Construction Documentation and Communication 3 What was meant to happen? There is supposed to be adequate bracing for a wall 8 meters wide and with a 45 degree pitched roof and the highest point being approx. 5 meters high, there needs to be adequate bracing in the wall as there... Continue reading
Posted Sep 21, 2010 at Zac Verstegen's blog
Comment
0
Construction Documentation and Communication 2...
Construction Documentation and Communication 2 What was meant to happen? There was supposed to be some hold down straps holding down from the wall to the joists as it was a load bearing wall, there were supposed to be two on each side. What did happen? When we looked at... Continue reading
Posted Sep 20, 2010 at Zac Verstegen's blog
Comment
0
Construction Doccumentation and Communication 1...
Construction Doccumentation and Communication 1 What was meant to happen? A wall was supposed to be built with an angle brace in it as that is what was supposed to read on the plans. What did happen? There was no mention of there to be an angle brace on the... Continue reading
Posted Sep 20, 2010 at Zac Verstegen's blog
Comment
0
Territorial Complience What was meant to happen?...
Territorial Complience What was meant to happen? Premade wall frames and trusses are supposed to be made with load bearing timber, usually of MSG6 (machine stress grade) or greater this will measure the stress forced upon the time until breaking point and then give it a grade with maximum being... Continue reading